Ai Consultancy provides a solution focused, professional and personalised service.
© Copyright Ai Consultancy (Aust). 2026.
All Rights Reserved. Created by Codex Digital.
Sometimes, building compliance issues only become obvious when construction documentation is almost finished.
For example, a staircase might need redesign, an accessible path might not meet prescriptive requirements, or a fire separation detail could clash with the architectural layout.
However, fixing these problems late in the process can increase consultant fees, stretch the project budget, and delay construction.
A BCA design review checklist helps architects, developers, and builders spot possible compliance gaps while there is still time to make changes. Furthermore, it provides a clear process for checking key building requirements before finalising drawings and specifications.
The checklist below highlights the main areas to review before moving on to construction documentation. Specific requirements vary by building classification, project scope, the NCC edition in use, and any state or territory differences.
For a broader overview of compliance for NSW developments, see our building compliance checklist for NSW developers.
To better understand its value, let’s look at what a BCA design review involves.
A BCA design review assesses a proposed building design against the applicable requirements of the National Construction Code (NCC), including the Building Code of Australia (BCA) provisions relevant to the project.
The review examines architectural drawings and supporting documents to identify potential non-compliances, missing details, coordination issues, and areas that may require specialist input.
It may be undertaken during concept design, design development, before a development application, or ahead of construction certificate or complying development certification.
For best results, the review should happen before construction documentation is finished. At this point, the design team usually has more flexibility to adjust layouts, coordinate building systems, and fix technical issues.
Use this BCA checklist as a starting point when reviewing your design. Keep in mind, it does not replace a project-specific compliance assessment, and ticking off each item does not guarantee NCC compliance.
The building classification determines many of the technical provisions that apply to the design. A building may also contain multiple classifications where different uses or parts of the development require separate consideration.
Before progressing, check that:
If the building is classified incorrectly, it can impact fire resistance, egress, accessibility, and other design requirements. Therefore, identifying the right requirements early gives the team a solid foundation for the rest of the review.
Fire safety requirements can influence the building layout, construction materials, services coordination, and relationships between different building uses.
The review should consider:
Fire safety design usually needs input from different specialists. To avoid coordination problems, identify what information is needed and who is responsible early, so the architectural documentation doesn’t move forward based on unconfirmed assumptions.
The arrangement of exits and paths of travel affects how occupants can leave a building during an emergency. Check these requirements against the building’s classification, layout, and applicable NCC provisions.
Review whether:
Changing a tenancy layout, room arrangement, or door position can affect how people exit the building. For this reason, always re-review these requirements if the design changes, rather than relying on a previous check.
Accessibility requirements affect entrances, circulation routes, doorways, sanitary facilities and other areas intended to be accessible under the applicable provisions.
The review should check:
Basic dimensions alone may not be enough. In addition, door hardware, wall finishes, fixtures, and other installed items can reduce usable space.
Where the project has complex access constraints or a proposed alternative solution, involve an access consultant early enough to inform the design.
The architectural design must align with the structural system and the applicable NCC requirements for the proposed building.
Before documentation is finalised, confirm that:
A BCA consultant is not a substitute for a structural engineer. Instead, the review highlights building code requirements and design areas that require the right technical expert.
Depending on the building classification and use, the NCC may contain requirements relating to sanitary facilities, ventilation, natural light, room heights, damp and weatherproofing, and other aspects of health and amenity.
Check whether:
Not all requirements apply to every building. As a result, the review should identify which ones matter for your project, rather than relying on a generic checklist.
A design may look compliant on a single drawing, but conflicts can appear when you review the architectural, structural, fire safety, and services information together.
Before issuing construction documentation, check that:
If the NCC needs specific proof of compliance, know who will prepare it and when it should be ready. Otherwise, missing calculations, reports, or design details can unnecessarily delay assessment and certification.
Identify potential BCA issues early to estimate upgrade costs, prioritise remedial work and avoid expensive surprises during refurbishment or redevelopment.
Review My Building →Finding a problem is just the beginning. The project team needs to know what needs to change, who is responsible, and if the issue affects other parts of the design.
A BCA design review may identify several types of action:
| Finding | Typical next step |
|---|---|
| A clear design non-compliance | Revise the design to meet the applicable requirement |
| Missing dimensions or details | Update the drawings or provide supporting information |
| Conflict between disciplines | Coordinate with the relevant consultants and resolve the interface |
| A potential Performance Solution | Arrange the required assessment and supporting evidence |
| An issue requiring specialist expertise | Engage the relevant fire safety, access, structural or services professional |
Not every issue requires a major redesign. For example, some problems can be fixed by making the documentation clearer or tweaking a detail. Others might affect the whole layout or need a specialist’s help.
Sort out these issues before the construction documents go out, and make sure everyone knows who is responsible for each task.
A building compliance consultant can help at different stages. Still, early involvement is especially helpful if your project has complex classifications, tight layouts, major accessibility needs, or tricky fire safety issues.
An early review is particularly useful when the project has complex building classifications, constrained layouts, significant accessibility requirements or challenging fire safety considerations. Guidance for design engineers and building certifiers can also clarify their roles in the building compliance process.
The design review should match the project’s stage and the information you have. An early review can highlight key risks, whereas a later, detailed review can check the final design and the proof needed for compliance.
A review does not replace the certifier or the responsibilities of specialist consultants. Rather, it helps the team identify what needs fixing and coordinate the necessary work.
Ai Consultancy provides BCA design reviews and reports to help architects, developers and builders identify potential compliance issues before they become harder and more expensive to resolve.
Our reviews cover building classification, fire safety, egress, accessibility, and how architectural documentation lines up with NCC requirements.
We give practical advice on issues that need clarification, design changes, or more specialist input. Additionally, if an alternative compliance approach is needed, we can also help with BCA performance solutions within the right framework.
Bringing in a consultant before construction documentation is finished gives the project team more time to deal with compliance issues while design decisions are still being made. Ultimately, this proactive approach helps prevent costly changes later on.
Get a BCA audit to clarify existing compliance gaps, understand potential upgrade obligations, and make informed property investment or redevelopment decisions.
Discuss Your Building →The documents you need depend on the project’s stage and scope. These might include architectural plans, site plans, elevations, sections, specifications, development consent details, and reports from fire safety, access, structural, or services consultants. If information is missing, the review may be limited or may prompt further assessment.
Not every project needs a separate BCA design review. Still, building regulations, approval conditions, and certification processes may require proof that the design meets the required standards. A review can help spot issues before you submit your documentation for assessment.
A BCA design review mainly checks a proposed design and its documents against the building requirements. A BCA audit usually reviews an existing building or completed work to identify potential compliance gaps. The right service depends on whether your project is still in design or the building is already built.
A BCA consultant can review your design, identify potential compliance issues, and provide recommendations within the agreed scope. Only the relevant authority or an authorised certifier can formally approve or certify the design. The consultant’s role is different from the legal responsibilities of those parties.
Ideally, start the review during concept design or design development, when you can still change major layout decisions. Another review before construction documentation is finished can check whether the requirements have been included and spot any remaining issues that need to be resolved.